Bridge for the Montessori-School
Trough Bridge in Krefeld
Description
Because the old bridge crossing the school yard of the Montessori school in Krefeld was not repairable, it was replaced by a new timber construction. The glulam beams are protected by a lateral cladding made of larch and a zinc sheet metal on the top. The cladding continues up to the handrail to form a proper guardrail for the primary school children. The school is now provided with a good looking and durable construction.
Client
Bischöfliches Generalvikariat Aachen
Year of construction
2014
Design and supervision
WILHELM architekturbüro
Dimensions
Length: 13,85 m
Width: 2,80 m
Structure
Main structure made of spruce glulam with lateral larch cladding. Bridge decking mastic asphalt.
Our services
Consultancy timber structure, structure planning
Views
Previous
Next