Skip to content

Timber Bridge in Garmisch

New Construction of a Footbridge Across Partnach River

Description

This design convinces with a special simplicity. The two cladded glulam girders form the guard rail so that a handrail can be renounced. The bracing frames made of galvanised steel are hidden in the cladding which creates a continuous wood surface. The decking made of larch planks adapts this concept. Just the upper zinc sheet metal cover of the glulam beams is visible.

Client
Markt Garmisch-Partenkirchen

Year of construction
2009

Dimensions
Length: 28,00 m
Width: 2,00 m

Structure
Single span trough bridge made of spruce glulam with lateral ventilated cladding and decking with larch planks

Our services
Consultancy timber structure

Other views of the bridge

Previous
Next