Skip to content

Heavy Load Bridge Crossing Channel

Truss Bridge in Templin

Description

Old tradition in a new guise. With the capacity for heavy vehicles, precisely for 12 tons heavy vehicles, this bridge has a large span. The roof protects the whole construction from weather influences and make the structure solid and durable with low costs of maintenance. Timber bridges of similar design have been under traffic for over 750 years. Long tradition of building and the concept of sustainability is what it makes original.

Client
City of Templin

Year of construction
2004

Dimensions
Length: 73,70 m
Width: 4,80 m

Construction
Glue laminated timber truss construction with tiled roof

Our services
Design Engineering and structural engineering

Other views of the bridge

Previous
Next