Skip to content

Bike path connection made of timber

Cyclists bridge near Gaasterlan - NL

Description

Simple construction with a noble finish: The trough bridge made of spruce glulam with a mastic asphalt decking was cladded with Red Cedar profiles. This extremly durable wood distinguishes itself through an especially diversified colouring and a very fine surface which gives the bridge a very classy character. The bridge was preassembled including the mastic asphalt decking. Two mobile cranes lifted the bridge in the final position.

Client
Municipality Gaasterlan – Sleat

Year of construction
2011

Dimensions
Length: 24,00 m
Width: 2,30 m

Construction
Trough bridge with lateral cladding with Red Cedar wood. The mastic asphalt surface was already applied during the prefabrication of the bridge in the plant.

Out service
Conception and design, structural calculation, construction work

Other views of the bridge

Previous
Next