Skip to content

Cycle Bridge in Werratal

Cable Stayed Bridge Between Frankenroda and Ebenshausen

Description

In line with an economic stimulus package the Werratal cicyle path was expanded. Along a former railway route now the cycle path leads to a new timber bridge. The combination of trough and pylon construction with laminated timber beams was very suitable in this case and it is attractive both in economic and in visual matters. The blue pylons are similar to the “Sister bridge” in Ebenhausen. The abutments of the old railaway bridge were reused for the bridge. Alternatives, such as a concrete bridge design, would have been too heavy.

Client
District of Wartburg

Year of construction
2011

Structural calculation
HSW Ingenieure, Bad Oeynhausen

Dimensions
Length: 104,25 m
Width: 3,00 m

Structure
Four-part trough bridge with two steel pylons and connecting rods. Side cladding made of larch, upper side protected with titanium zinc sheet. The decking is mastic asphalt.

Our service
Consultancy timber structure, project management during execution and installation

Views

Previous
Next