Skip to content

Foot and cycle path overpass via the B11

Strut Frame Bridge in Pullach

Description

The block girder bridge spans a lower road and is supported by two inclined struts. The block girder is covered with mastic asphalt on a rear-ventilated substructure and is laterally sloped and clad. This effectively protects the wood against driving rain. Due to the low weight of the block girder, the bridge could be completely prefabricated in the factory except for the mastic asphalt and was installed within one day. As a replacement new construction, this strut frame bridge is oriented to its predecessor and has been optimised, especially with regard to the formation of the mastic asphalt pavement and its transitions. A monitoring system monitors whether moisture is present beneath the asphalt sealing.

Client
Municipality Pullach

Year of Construction
2019

Dimension
Length: 22,50 m
Width: 2,40 m

Construction
Block-glued spruce glued laminated timber construction with mastic asphalt decking and steel railing

Our Service
factory planning

Views

Previous
Next