Opening of a New Development Area
Girder Bridge in Ilshofen
Description
The wooden bridge spans a small stream and thus serves to further opening of a new development area through a cycle and sidewalk. According to DIN EN 1995-2, the construction must be classified as a protected supporting structure, since weathering due to lateral cladding and top-side sheet metal covers is avoided. According to the “Exemption Amount Calculation Ordinance – ABBV”, a theoretical servicelife of 60 years can be assumed. The bridge is equipped with a galvanized filled rod guardrail and a covering of perforated metal planks
Client
City Ilshofen
Year of Construction
2017
Dimensions
Length: 10,00 m
Width: 2,00 m
Construction
Gigder bridge made of spruce glulam, filled rod guardrail, covering out of perforated metal planks
Our service
Structural planning – Service phase 5 according to German HOAI