Skip to content

Opening of a New Development Area

Girder Bridge in Ilshofen

Description

The wooden bridge spans a small stream and thus serves to further opening of a new development area through a cycle and sidewalk. According to DIN EN 1995-2, the construction must be classified as a protected supporting structure, since weathering due to lateral cladding and top-side sheet metal covers is avoided. According to the “Exemption Amount Calculation Ordinance – ABBV”, a theoretical servicelife of 60 years can be assumed. The bridge is equipped with a galvanized filled rod guardrail and a covering of perforated metal planks

Client
City Ilshofen

Year of Construction
2017

Dimensions
Length: 10,00 m
Width: 2,00 m

Construction
Gigder bridge made of spruce glulam, filled rod guardrail, covering out of perforated metal planks

Our service
Structural planning – Service phase 5 according to German HOAI

Other views of the bridge

Previous
Next