Previous
Next
Lohmar Office – DE November 2014
To close the gap in a cycle path, the design of a wooden tension band bridge was further developed and a draft plan was created. The bridge spans two fields with a total length of approx. 95 m and fits harmoniously into the river landscape. The support saddles made of glued laminated timber are a special detail.