Skip to content
Miebach engineering office
Miebach engineering office
 
  • Timber Engineering
    • Timber bridge construction
    • Timber bridge systems
    • Special timber constructions
    • Service life monitoring
  • Services
    • Service Phases according to HOAI
    • Analysis and evaluation
    • Draft Design and Structural Design
    • Project management
    • Inspections of timber structures
  • Projects
    • Timber bridges
    • Special timber constructions
    • Inspections Refurbishment Concepts
    • Project map
  • Office
    • Motivation
    • Career
    • Team
  • Latest News
    • News
    • Lectures
    • Publications
  • Contact
  • /DE
  • Timber Engineering
    • Timber bridge construction
    • Timber bridge systems
    • Special timber constructions
    • Service life monitoring
  • Services
    • Service Phases according to HOAI
    • Analysis and evaluation
    • Draft Design and Structural Design
    • Project management
    • Inspections of timber structures
  • Projects
    • Timber bridges
    • Special timber constructions
    • Inspections Refurbishment Concepts
    • Project map
  • Office
    • Motivation
    • Career
    • Team
  • Latest News
    • News
    • Lectures
    • Publications
  • Contact
  • /DE

Competition: Design for the Lower Thames Crossing (LTC)

Upminster – UK March 2026


The EcoSpan block-supported bridge, a finalist in the National Highways competition in 2025, is due to be built in 2026.

PROJECT DETAILS »

© 2026 IB-MIEBACH

  • Privacy Policy
  • Imprint
×
  • Privacy Policy
  • Imprint

Haus Sülz 7
53797 Lohmar
Tel. 02205. 90 44 80

  • LinkedIn
  • Instagram
  • Facebook
×
  • LinkedIn
  • Instagram
  • Facebook