Skip to content

Footbridge Crossing Highway L127

Trough Bridge Kirchzarten

Description

In this case a new bridge construction was economically advantageous compared to a renovation of the existing bidge. The trough bridge replaces a timber construction which did not have a sufficient protection from weathering and the required load capacity could not be guaranteed anymore. The client decided to commission a new timber bridge instead of a renovation. The existing bridge could be dismantled and the new bridge assembled within a single day. Due to this process the walkway did not have to be closed for more than one day and also the road was blocked for only a few hours. Contrary to the old construction the new bridge is laterally covered with larch so that the glulam beams are protected from weathering.

Client
City of Freiburg

Year of construction
2013

Dimensions
Length: 25,00 m
Width: 2,50 m

Construction
Glulam beams covered with rhepanol foil and zinc sheet metal. Steel frames carry the decking construction and brace the structure. Douglas fir planks as decking. Steel railings with handrail attached to the steel frames. Lateral claddig with larch.

Our Services
Project assistance

Other views of the bridge

Previous
Next