Skip to content

Kalkar/ Am Wisseler See

Refurbishing a Timber Arch Bridge

Description

The existing arch bridge was not sufficiently protected from weathering. To ensure protection, a lateral wooden cladding and top cover made of titanium zinc plates were installed. By these measures, the bridge is considered to be protected and prepared for many more years.

Client
City of Kalkar

Year of construction
1995

Dimensions
Lenght: 26,00 m
Width: 2,50 m

Structure
Main beam laterally covered with larch three-layer panels; topside titanium zinc sheet

Our service
consultancy timber works during refurbishment

Other views of the bridge

Previous
Next